THE ANALYSIS OF DELAY IMPLEMENTATION RISK SPATIAL BALANCE INTEGRATION MAPPING PROJECT IN THE CILIWUNG-CISADANE RIVER AREA
DOI:
https://doi.org/10.53067/ijomral.v2i4.138Keywords:
Risk analysis, Spatial Balance IntegrationAbstract
Consulting Service jobs often have high complexity; only some of these jobs experience delays in completion. The delay has a significant impact on both the employer and the party that is responsible for carrying out the activity. The uncertainty extremely influences both of these parties. In this study, an examination of the factors that carry a high potential for resulting in delays in the completion of activities is carried out. This investigation classified risk factors into one of three categories according to the implementation stage. They are variable components of support for the implementation of work, technical implementation of work, and assistance/supervision of activities. Factors with a high level of risk are then responded to with a risk response as a step to follow up on these risk factors. As for minimizing risk, the Risk Reduction method is used
Downloads
References
Al-Hammad, A. (2000). Common Interface Problems among Various Construction Parties. Jurnal Performance Construction Facilities.
Dewi, N. P. (2013). Analisis Risiko pada Pekerjaan Pengaman Pantai Klating di Kabupaten Tabanan. Jurnal Media Bina Ilmiah, Vol. 7, No. 1, ISSN No. 1978-3787.
Flanagan, R. N. (1993). Risk Management and Construction. Cambridge: University Press.
Hidayat, I. (2012). Project Risk Management.
Joni, I. G. (2012). Risiko manajemen Kegiatan. Jurnal Ilmiah Teknik Sipil, 16, Vol. 16, No. 1.
Kartika, E. (2014). Tugas 2: Ringkasan Singkat Manajemen Kegiatan dan Risiko.
Kidding. B. (2011). Zonasi Kawasan Pesisir Pantai Makassar Berbasis Mitigasi Bencana (Studi Kasus Pantai Barambong-Celebes Convention Centre). Jurnal Zonasi Kawasan Pesisir Pantai, Vol. 5, ISSN 978- 979.
Labombang, M. (2011). Manajemen Risiko dalam Kegiatan Konstruksi. Jurnal SMARTek, Vol. 9, No. 1.
Max, T. (2013). Manajemen Risiko dalam Kegiatan Konstruksi.
Mulcahy, R. (2010). Risk Management, Trick of the Trade for Project Managers.
Project Management Institute. (2008). A Guide to the Project Management Body of Knowledge, Third Edition, American National Standard, P.A.
Rahmatullah. T. (2012). Perbedaan Mendasar "Penelitian Kualitatif dan Kuantitatif.
Santosa, B. (2009). Manajemen Kegiatan Konsep dan Implementasi, Graha Ilmu. Siswanto. (2011). Analisa Risiko pada Masa Konstruksi Kegiatan Pembangunan Dermaga Multipurpose Teluk Lamong Surabaya.
Sukaarta, I. W. (2012). Analisis Risiko Kegiatan Pembangunan Dermaga Study Kasus Dermaga Pehe di Kecamatan Siau Barat Kabupaten Kepulauan Sitaro. Jurnal Ilmiah Media Engineering, Vol. 2, No. 4 ISSN 2087-9334 (257-266).
Tahir, A. (2009). Indeks Kerentangan Pulau-pulau Kecil: Kasus Pulau Barrang Lompo-Makassar. Jurnal Ilmu Kelautan, Vol. 14 (4): 8-13.
Wibisono. (2010). Tugas 3: Risiko Manajemen dan Manajemen Kegiatan, Manajemen Kegiatan dan Risiko.
Yulianto. (2012). Implementasi Manajemen Risiko Kegiatan Pengembangan Perangkat Lunak: Studi Kasus MYBIZ 2 di Software House ABC. Jurnal Informatika Mulawarman, Vol. 7, No. 2.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Yudi Firmansyah, Pio Ranap Tua Naibaho

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.