Yulitasari, A. ., Prajoko, A. ., Mubarak, A. ., & Manurung, E. H. . (2023). ANALYSIS OF COST AND CASTING TIME WITH CONVENTIONAL AND PRECAST METHODS ON THE CITEREUP FLYOVER CONSTRUCTION PROJECT. International Journal of Multidisciplinary Research and Literature, 2(2), 258–264. https://doi.org/10.53067/ijomral.v2i2.111