[1]
Yulitasari, A. , Prajoko, A. , Mubarak, A. and Manurung, E.H. 2023. ANALYSIS OF COST AND CASTING TIME WITH CONVENTIONAL AND PRECAST METHODS ON THE CITEREUP FLYOVER CONSTRUCTION PROJECT. International Journal of Multidisciplinary Research and Literature. 2, 2 (Mar. 2023), 258–264. DOI:https://doi.org/10.53067/ijomral.v2i2.111.