SCHEDULING SYSTEMS MAKE TO STOCK TO OPTIMIZING THE PRODUCTIVITY PROJECT PLANNER AT PT. GUNANUSA FABRICATORS

Authors

  • Khaeruman Khaeruman Universitas Katolik Indonesia Atma Jaya
  • Maria Angela Kartawidjaja Universitas Katolik Indonesia Atma Jaya
  • Ronald Sukwadi Universitas Katolik Indonesia Atma Jaya

DOI:

https://doi.org/10.53067/ijomral.v3i3.228

Keywords:

Production Scheduling, Make-To-Stock, Efficiency, Project Planner, Challenges, Stock Management

Abstract

This research evaluates the effectiveness of the Make-to-stock scheduling system at PT. Gunanusa Utama Fabricators to optimize project planner productivity. The methods used include interviews, direct observation, and analysis of historical production data. The results show that implementing the Make-to-stock system increases production efficiency by maintaining stock that is ready to sell before demand arises. Challenges mainly relate to efficient stock management and complex production scheduling. This research highlights the importance of the role of project planners in facing a rapidly changing industrial environment and the comparison between manual and automatic scheduling. The implications are relevant for manufacturing companies in improving their operational performance by selecting scheduling methods that suit their unique context and characteristics

Downloads

Download data is not yet available.

References

Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2019). Manajemen Operasi untuk Kompetitif Dunia (Edisi ke-15). New York, NY: McGraw-Hill Education.

Laudon, K. C., & Laudon, J. P. (2020). Sistem Informasi Manajemen: Mengelola Perubahan Digital (Edisi ke-16). Boston, MA: Pearson Education.

Nurainun, Tengku. (2019). Batching & Sequencing Model Matematis Komunikasi Untuk Sistem Manufaktur Flow Shop. Pekanbaru: Cahaya Firdaus.

Render, Barry; Heizer, Jay; Munson, Chuck. (2017). Operations management: Sustainability And Supply Chain Management. Jakarta: Salemba Empat.

Sahir, Syafrida Hafni. (2021). Metodologi Penelitian . Penerbit KBM Indonesia.

Turner, J. R. (2019). The Handbook of Project-based Management: Leading Strategic Change in Organizations (Edisi ke-4). New York, NY: McGraw-Hill Education.

Zaenal, Mohammad. (2019). Manajemen Operasional. Yogyakarta: Deepublish.

Azeharie. (2022). Strategi Pengelolaan Sistem Penjadwalan Produksi: Studi Kasus PT. Gunanusa Utama Fabricators. Jurnal Manajemen Produksi, 15(2), 45-58.

Habibatullah, Salwa; Darmiyanti, Astuti; Aisyah, Dewi Siti;. (2021). Potensi Bahasa Anak Usia Dini 5-6 Tahun melalui Metode Bercerita. PAUD Lectura: Jurnal Pendidikan Anak Usia Dini, Vol. 4, No 2, 2-3.

Handayani. (2018). Perbandingan Antara Penjadwalan Manual dan Otomatis dalam Industri Manufaktur. Jurnal Manajemen Operasi, 25(4), 332-345

Susanto. (2020). Tantangan Penjadwalan Produksi dalam Industri Manufaktur Modern. Jurnal Manufaktur Modern, 8(1), 112-125

Santoso. (2020). Peran Manajemen Stok dalam Meningkatkan Kinerja Produksi: Analisis Kasus PT. Gunanusa Utama Fabricators. Jurnal Manajemen Produksi, 18(3), 211-225

Team, Kuncie Jurnal. (2023). Kuasai Kemampuan Teknik Analisis Data Kualitatif. Retrieved from Kuncie: https://www.kuncie.com/posts/teknik-analisis-data-kualitatif/

Rahardjo, Mudjia;. (2011, Juni 10). Metode Pengumpulan Data Penelitian Kualitatif. Retrieved from UIN MAULANA MALIK IBRAHIM MALANG: https://uin-malang.ac.id/r/110601/metode-pengumpulan-data-penelitian-kualitatif.html

Downloads

Published

2024-05-30

How to Cite

Khaeruman, K., Kartawidjaja, M. A. ., & Sukwadi, R. . (2024). SCHEDULING SYSTEMS MAKE TO STOCK TO OPTIMIZING THE PRODUCTIVITY PROJECT PLANNER AT PT. GUNANUSA FABRICATORS. International Journal of Multidisciplinary Research and Literature, 3(3), 368–377. https://doi.org/10.53067/ijomral.v3i3.228